How to Get Heavy Items Delivered in Singapore: Machinery, Building Materials and Bulky Stock
Weight, dimensions, packing and how each end loads decide the vehicle before anyone names one. Here is how to answer those four questions for machinery, generators, building materials and bulky stock.
To get a heavy item delivered in Singapore, give the carrier four facts before you ask for a vehicle: what it weighs, what it measures, how it is packed, and how it will be loaded and unloaded at each address. Those answers decide whether the job is a van, a 10ft, 14ft or 24ft lorry with a tailgate and pallet jack, or a crane lorry, and whether the driver needs a helper. Most delays with machinery, generators, building materials and bulky stock trace back to one of those facts being missing on the day.
The four questions the carrier will ask
Every carrier quoting a heavy item wants the same four things: the weight, the dimensions, the packing and the loading arrangement at both ends. Give them up front and the quote is usually right first time. Leave one out and the wrong vehicle turns up.
- Weight, per piece. The heaviest single piece decides whether anything can be hand-carried, rolled on a pallet jack or must be lifted. Take the figure from the nameplate or spec sheet, and say whether it includes the pallet, skid or crate.
- Dimensions as it will travel. Length, width and height including any pallet or crate underneath. A tall machine on a skid needs a different body from one that lies flat.
- How it is packed. Loose on its own feet, bolted to a skid, strapped to a pallet, or fully crated. Packing decides what can grip the item and whether a pallet jack can get underneath it.
- How it is loaded and unloaded. A dock with a forklift at each end is one kind of job. A kerb outside a workshop with nothing to lift is another. Describe both addresses, and send a photograph of the item where it stands.
Why the loading point decides the vehicle
The loading arrangement at each end changes the vehicle more than the weight does. The same machine is a plain lorry job between two docks and a crane job between two workshop floors. Check both addresses first.
- Dock to dock. A forklift at each end does the lifting, so the lorry only has to carry.
- Ground level with no dock. A tailgate lowers the load to the ground and a pallet jack rolls it the last few metres. This needs the item on a pallet, hard level ground, and a weight the tailgate and jack are built for. A pallet jack cannot climb a kerb or cross gravel.
- Ground level, and it cannot be pallet-jacked. A crated machine with no pallet underneath, an item on skids, or a piece too heavy to roll safely needs lifting. That is where a crane lorry replaces the tailgate. The end without equipment sets the vehicle.
Van, 10ft, 14ft or 24ft lorry: choosing by weight and size
Choose the smallest vehicle that takes the heaviest piece and the whole load in one trip, with room left to secure it. Weight sets the floor, dimensions set the body, and access can rule out the larger lorries altogether.
A van suits boxed parts and anything two people can lift. A 10ft lorry takes small-to-medium loads and, as an open body, long or awkward items. A 14ft box body with a tailgate is the usual answer for palletised stock and single machines that can be rolled. A 24ft lorry is for bulk runs where both ends have ground-level access for a vehicle that size. Our lorry sizes guide covers dimensions, payloads and which bodies clear HDB carpark barriers, so this post will not repeat it.
The table below shows how common heavy loads are usually loaded and which vehicle usually carries them. It is a starting point; the carrier confirms the vehicle against your actual weights, packing and access.
| Load | How it is usually loaded | Vehicle usually used |
|---|---|---|
| Boxed spare parts, tooling, small components | Hand-loaded | Van |
| Single machine on a pallet or skid | Forklift at a dock, or tailgate and pallet jack at ground level | 10ft or 14ft lorry |
| Generator or compressor on a frame | Forklift at a dock, or lifted at ground level | 14ft lorry at a dock; crane lorry with no dock |
| Crated machine with no pallet underneath | Lifted by slings or lifting eyes | Crane lorry |
| Building materials on pallets: cement, tiles, bricks | Forklift at the supplier; tailgate and pallet jack or a lift at the site | 14ft or 24ft lorry; crane lorry for ground-to-site lifts |
| Long items: pipes, steel sections, scaffolding | Hand-loaded or lifted, tied at several points | 10ft open body or 24ft lorry |
| Bulky stock: racking, display units, cartons in volume | Hand-loaded or palletised, packed to the headboard | 14ft or 24ft lorry |
If your supplier can palletise the item, the ground-level options open up and the crane lorry is often not needed.
When a crane lorry is the right tool, and when it is not
A crane lorry is the right tool when the load cannot be hand-carried or rolled at one or both ends, and there is no dock or forklift to do the lifting. It is the wrong tool when a tailgate would do, or when the setting-down point cannot be reached from where the lorry can park.
Before you book one, check that the lorry can park and extend its outriggers beside the load, that the air above is clear of awnings and cables, that the item has somewhere to take a sling or hook, and that the setting-down point is within reach. A piece that must go through a doorway or up a floor is not a crane lorry job on its own.
The Relo lorry transport service Singapore page puts a 10ft, 14ft or 24ft lorry and a Relo driver on the job, with a helper on request, and the page is specific about the ground-level case: “A tailgate and a pallet jack are available on request for ground-level loading where there is no dock.” Its crane lorry work is listed as “Machinery, generators and equipment moved between premises at ground level”, and it states: “The vehicle that lifts is the vehicle that carries, so there is no second vehicle and no second crew.” The page asks for the numbers first: “Tell us the weights so each lift can be checked against the crane’s capacity.” On sizes it gives one sentence: “A van carries under a tonne, a 10ft lorry around 1 to 1.5 tonnes, a 14ft lorry around 2.5 to 3 tonnes and a 24ft lorry up to about 9 tonnes.” The vehicles and drivers are Relo’s own, not a broker’s, and the written quote names the vehicle, the trips, the crew and the access.
Securing the load
A heavy item is secure when it cannot slide, tip or shift under braking and cornering, and nothing is resting on a part that cannot take the weight. Straps hold it down, blocking stops it sliding, and the way it sits on the bed sets the centre of gravity.
- Keep the centre of gravity low and forward. Heavy end down, heavy side against the headboard, never stacked on something lighter.
- Strap through the frame, not over the shell. Ratchet straps go through lifting points, around the base frame or over the skid, never over a guard or control box.
- Block it. Timber blocking or chocks against the base stop the item creeping even if a strap loosens.
- Prepare machines the way the manufacturer says. Drain or secure fluids, lock anything that moves, tape down covers, and crate anything with exposed precision surfaces.
- Band and wrap materials. Bagged and boxed materials travel shrink-wrapped on pallets; loose tiles are the first thing to shift. Long items are tied at several points.
Access checks at both addresses
Check access at both addresses before the vehicle is booked, because the taller lorries and the crane lorry cannot go everywhere a van can. The usual blockers in Singapore are height barriers, ramps, lift limits and the walk from the nearest parking point.
- Height barriers. HDB multi-storey carparks, condo basements and some mall loading bays have barriers that stop a tall box body. Read the posted clearance and tell the carrier.
- Industrial estate ramps and bays. Note the ramp gradient, whether the bay is a raised dock or ground level, and whether it has to be booked.
- HDB blocks and condos. Bulky items go by the service lift, so check its stated load limit and door size. Condo management usually wants a permit, a loading bay slot and the lift padded.
- Sites. Confirm gate times, the pass the site needs, whether the lorry can drive to the setting-down point, and who will receive the item.
- The last fifty metres. A pallet jack on a slope, a flight of steps, a gravel path or a narrow door turns a simple drop into a lift. Measure the route out as well as the route in.
Driver only, or driver and helper
The driver alone is enough when the item is loaded and unloaded by equipment at both ends, or by your own people. Add a helper when the load needs lifting, carrying, stacking or a long walk from the vehicle to where it is going.
Three examples settle most cases. Pallets from your dock to the customer’s dock: driver only. Twenty cartons of racking to a third-floor stockroom by the service lift: driver and helper. A generator from a kerb to a plant room: a crane lorry to lift it, plus a helper if it has to be positioned once it is down. A helper is not a substitute for a crane; if a piece is too heavy for two people, the answer is equipment. Whoever you book, the helper should be a named line on the quote.
Frequently asked questions
On-demand apps publish their own weight and size limits for each vehicle type, so check the app for the current figures before booking. Those limits describe what fits in the vehicle, not how it gets in without a dock. A driver-supplied lorry or crane lorry is quoted per job against the actual weight, packing and access instead.
Within Singapore the cost of a heavy item is driven by access, lifting and trips rather than by distance. The cheapest arrangement is usually the one that needs the least equipment: a dock or forklift at both ends, the load on a pallet, everything in one trip and no waiting at the gate. Fix those before comparing quotes.
Confirm the weight and travelling dimensions from the nameplate or spec sheet, then follow the manufacturer’s transport instructions: drain or secure fluids, lock or retract moving parts, and protect exposed surfaces. Bolt it to a skid or pallet if it has no lifting points, label it, and photograph it before it leaves the floor.
Load on firm, level ground with the heavy end against the headboard and the centre of gravity low. Strap through the frame or lifting points rather than over covers, block the base so it cannot slide, protect strap edges, and have a second person check before the lorry moves. Re-check the straps after the first stretch of road.
Need reliable logistics across Singapore?
Relo runs recurring routes with a dedicated fleet, real proof-of-delivery and warehousing under one roof — one partner for everything you move.